News classification
Contact us
- Add: Room 5-1-1402, tou Jing Yue House, 50 Nan Xin Zhuang East Street, Huaiyin District, Jinan, China
- Tel: 13305313157 15588877119
- Fax:
- Email: 21345343@QQ.com
Installation steps of fixed smoke-proof vertical wall
1. Layout and Positioning
Use a laser level and theodolite to measure and mark the layout, ensuring the axis is parallel or perpendicular to the main structure of the building, with a centerline deviation of less than 1–2 mm.
2. Upper Hanger Installation
- Inspect the quality of threaded rods and metal expansion tubes. Drill holes to the depth specified by the manufacturer and clear out dust and debris.
- Position the hangers according to the design drawings, ensuring the centerline aligns with the components. After passing inspection, apply anti-rust paint.
3. Glass Installation and Positioning
- Inspect the glass quality, mark the center position, and install electric vacuum lifters for positioning.
- Manually or electrically lift the glass, align it slowly, and lower it carefully to avoid collisions. Secure it with adjusting screws and check the verticality.
4. Sealant Application
- Clean the sealing area, apply masking tape, and inject sealant simultaneously on both sides. The sealant joint should be 2 mm wide and 3.5–4.5 mm thick.
5. Surface Cleaning and Handover
- Clean the inner and outer surfaces of the glass, inspect the sealant joints, and organize construction records and handover documents.
PREVIOUS:Industry development
NEXT:Installation steps of electric smoke-pro